In this project a sprinkler line burst on the third floor.
On the 3rd floor of the property a supply line to the sprinkler system burst affecting the 3rd floor, 2nd Floor and 1st Floor. Water Out received the call at 7:00am on Monday morning when the loss was discovered. By 8:00am Water Out had arrived with multiple Emergency Response Vehicles and crews. After 3 Days the building had been cleaned and dried. Building multiple drying chambers implementing a plan for the occupants of the space made for zero work downtime during the project.